Shaped by exceptional experiences and trusted relationships built over four generations of family ownership.
MCAA/CNA Safety Excellence Award winner with an EMR of 0.57 — fostering workplaces where every person goes home safe.
103+ years of delivering mission-critical mechanical systems for the institutions that matter most.
Client Portfolio
College Park, MD · MEP Engineer: Mueller Associates
Inside the Project
Two Summers, One System
Phase 1 · North Wing
Heffron pipefitters, welders, and plumbers worked shoulder-to-shoulder with core drillers, framers, carpenters, insulators, electricians, painters, drywallers, abatement crews, and housekeeping to demolish the existing hot water convectors, mains, risers, heat exchangers, and pumps — and stand up the infrastructure for a new dual-temperature water system in their place.
By the end of the summer, 163 new fan coil units, new mains, and new risers were in place on the north side of the building, with the mechanical room rebuilt to serve them.
Phase 2 · South Wing
The second summer carries the same multi-trade coordination forward to the south side of the building, installing 240 additional fan coil units and tying them into the dual-temperature system Heffron commissioned the previous year.
Lessons learned from Phase 1 — sequencing, prefabrication, and trade hand-offs — drive a tighter, faster install with the same standard of quality the university expects.
Mechanical Room
In the mechanical room, Heffron installed two heating-zone heat exchangers, a cooling-zone chilled-water heat exchanger, three dual-temperature distribution pumps, and the control valves that orchestrate automatic dual-temperature switching across the building.
A complete new domestic water system was installed alongside it — one backflow preventer, a packaged booster pump set, two domestic water heat exchangers, two zone mixing valves, and four water meters — with new domestic risers run throughout the residence hall.
Mechanical Scope
Partner with Heffron
From early design assist through commissioning, Heffron self-performs the mechanical work your team can schedule a semester around.