Shaped by exceptional experiences and trusted relationships built over four generations of family ownership.
MCAA/CNA Safety Excellence Award winner with an EMR of 0.57 — fostering workplaces where every person goes home safe.
103+ years of delivering mission-critical mechanical systems for the institutions that matter most.
Project Overview
Heffron was contracted to modernize the air handling infrastructure within Operating Pod 1G at Washington Hospital Center — replacing 26 supply air VAV units with new fan arrays, coils, controls, dampers, AQUIS treatment systems, and filter racks, followed by installation of a Glyco Air Coiled Subcooling Chiller.
The work advanced while the hospital remained fully operational and while scheduling pressures intensified under elevated COVID-era constraints. Coordination with MedStar facilities management was constant, because every sequence had to protect active clinical operations first.
Project Details
MedStar Washington Hospital Center
Washington, DC
Healthcare
Operating room air handling modernization in active hospital
Have a similar project?