Shaped by exceptional experiences and trusted relationships built over four generations of family ownership.
MCAA/CNA Safety Excellence Award winner with an EMR of 0.57 — fostering workplaces where every person goes home safe.
103+ years of delivering mission-critical mechanical systems for the institutions that matter most.
Project Overview
When the federal government engaged Emergent BioSolutions in June 2020 to manufacture COVID-19 vaccines at scale, the company needed to expand its manufacturing capacity immediately. Heffron deployed double-shift crews working extended hours — an unprecedented staffing commitment — to meet a timeline that had no margin. Design and construction ran concurrently, with engineers staying one day ahead of field crews as piping revisions came through in real time. The project was delivered on schedule.
Partnering with Buch as general contractor, Heffron also delivered the mechanical scope on a separate lab renovation for Emergent — isolating a viral lab from the surrounding support labs through heavy ductwork modifications and a dedicated exhaust fan, extending process gases to each lab from a centralized change-over station, and converting an existing cold box into a gowning vestibule. Casework modifications and finish, electrical, and security upgrades rounded out the build, all coordinated inside an active research environment.
Project Details
Emergent BioSolutions
Rockville, MD
Life Sciences
45,000 sq ft
Have a similar project?