Home Project AstraZeneca | 200 Orchard

AstraZeneca | 200 Orchard

Gaithersburg, MD

Project Overview

Part of Heffron’s ongoing mechanical work across the AstraZeneca campus, the 200 Orchard project covers full mechanical scope inside an active life-sciences environment — primary hot and chilled water distribution with full pipe insulation and jacketing, process piping, sanitary waste, vent, and fixture rough-in (including Geberit wall-hung carriers), ductwork, and rooftop York air-cooled chiller installation, tie-ins, startup, and commissioning. Every line is identified and labeled to the campus standard so facilities staff can trace and service the system on day one.

Heffron crews welded, fabricated, and installed pipe and equipment alongside in-house planning and coordination with AstraZeneca facilities staff. The work reflects the standard the client expects on this campus: precise execution in occupied space, with safety and quality treated as non-negotiable.

On 200 Orchard, Heffron worked as a true extension of the general contractor’s team — owning the mechanical scope end-to-end, hitting the schedule, and keeping the GC out of the weeds on coordination, submittals, and field issues. That’s the way we partner with every GC or client we work with: predictable execution, clean handoffs, and no surprises on the punch list.

Project Details

Client

AstraZeneca

Location

Gaithersburg, MD

Sector

Life Sciences

Mechanical Scope

Hot & chilled water distribution · Process & plumbing piping · Ductwork · Rooftop York chiller installation & tie-ins

Delivery

Self-perform mechanical (weld, fab, install)

Project Gallery

On-site at AstraZeneca 200 Orchard.

Have a similar project?

Let's talk about what you're building.

Heffron self-performs mechanical construction across the Mid-Atlantic — including inside active, validated production facilities.