Shaped by exceptional experiences and trusted relationships built over four generations of family ownership.
MCAA/CNA Safety Excellence Award winner with an EMR of 0.57 — fostering workplaces where every person goes home safe.
103+ years of delivering mission-critical mechanical systems for the institutions that matter most.
Project Overview
In 2018, Heffron was selected to design and build the mechanical and plumbing systems for WMATA’s new headquarters at 300 7th Street SW — a full retrofit of a building stripped back to structural concrete for renovation. The primary challenge was the original 1960s ceiling heights, which left almost no room for conventional distribution.
Heffron engineered a low-profile Dedicated Outside Air System terminal unit integrated with a VAV air handler, fitting full mechanical capacity into a building envelope that standard approaches could not accommodate. Downtown road-closure coordination, adjacent rail constraints, and the complexity of a full headquarters retrofit made the job a clear example of the firm’s design-build problem solving in a demanding urban environment.
Project Details
Washington Metropolitan Area Transit Authority
Washington, DC
Government
Design-Build
Bala
Studios Architecture
ENR Mid-Atlantic Best Renovation/Restoration 2022
Project Gallery
Have a similar project?